Water Distribution System Flow Chart

Article 11:   To see if the town will vote to raise and appropriate the sum of Three Million Six Hundred Thousand ($3,600,000.00) Dollars to prepare designs, permits and construct a stream diversion on the Hampton Falls River in Seabrook near the town boundary and to prepare designs and permits for the construction of a desalination facility and to install water meters as a part of a State mandated water conservation program if the diversion and permits for the desalination facility are approved by the state. This will be a non-lapsing, account per RSA 32 : 7, VI and shall not lapse until the work is complete or in five (5) years. The Selectmen and the budget committee recommend this appropriation.  (Majority vote required.)

The existing components of the Town Water Distribution System are shown in Black.
The systems to be implemented under Warrant Article 11 are shown below in Red.

 