Water Distribution System Flow Chart
![]()
Article 11: To see if the town will vote to raise and appropriate the sum of Three Million Six Hundred Thousand ($3,600,000.00) Dollars to prepare designs, permits and construct a stream diversion on the Hampton Falls River in Seabrook near the town boundary and to prepare designs and permits for the construction of a desalination facility and to install water meters as a part of a State mandated water conservation program if the diversion and permits for the desalination facility are approved by the state. This will be a non-lapsing, account per RSA 32 : 7, VI and shall not lapse until the work is complete or in five (5) years. The Selectmen and the budget committee recommend this appropriation. (Majority vote required.)
![]()
The existing components of the Town Water Distribution
System are shown in Black.
The systems to be implemented under Warrant Article 11 are
shown below in Red.

![]()